Heart of the Campus Development

Morecrofts secured this large high quality project in 2014.

The development included the construction of a new teaching block and also large meeting / social space as well as high tech teaching and meeting spaces for the University. An external meeting space with landscaping and eating areas were also formed as well to create a landmark project for the Universities students. The wide variety of construction methods including, a large concrete structure, colonnades, copper cladding and numerous forms of brickwork and timber cladding were used to create what can only be described as an incredible facility.

We were engaged to provide the complete design and installation of electrical services which involved detailed services designs including the incorporation of containment systems within the buildings fabric leaving a minimum visual view of cabling and containment systems in a concrete frame. The end result is fantastic with the University themselves extremely satisfied with the overall scheme quality and aesthetic appearance.

Nottingham Trent University
GF Tomlinson Building Ltd
CPW
Evans Vittori
£1.75 Million
34 Weeks
Clifton Campus, Nottingham

Incoming electrical mains power to each block
LED lighting with energy control lighting management systems
Small power / floor boxes
Fire and life safety systems
CCTV Security and access control systems
Mechanical wiring systems
AV system containment and power services
External lighting and power systems
Lightening Protection System